Headline »

May 13, 2012 – 10:25 | Comments Off

Leading U.S. offshore marine support vessel operator SEACOR Marine LLC. (SEACOR Marine), located in Houma, Louisiana, has chosen Kongsberg Maritime to supply sophisticated Dynamic Positioning systems for two new 190-foot CrewZer Class Crew boats (also …

Read the full story »
Video

the latest video posts

Business

the dp & offshore industy

Employment

the state of the job market

Regulatory

the legal side of things

Tonnage & Tech

ships, tools & technology

Home » Business

JDR to supply cable for Wave Hub

Submitted by on December 15, 2009 – 20:57No Comment

Wave HubJDR has been awarded a contract for the supply of subsea power cables for the UK’s ground-breaking Wave Hub project by the South West RDA (Regional Development Agency).

Wave Hub is a major marine renewables infrastructure project that will create an electrical ‘socket’ on the seabed in some 50 metres of water around 10 miles off the coast of Cornwall in South West England and connected to the National Grid via a subsea cable. Wave Hub will have an initial maximum capacity of 20MW (enough electricity to power approximately 7,000 homes) but has been designed with the potential to scale up to 50MW in the future.

The scope awarded to JDR includes 25km of 33kV three-phase power cables which will provide the essential link between the Wave Hub and the onshore control room. The Wave Energy Convertors are connected back to the Wave Hub by four additional 300m three-phase power cables and dry mate connector sets.  All cables include fibre optics and will be subject to rigorous integration testing.  JDR will also supply the ‘Wave Hub’ assembly consisting of subsea terminations and a complete subsea protection structure. The package of equipment will be delivered in the second quarter of 2010 from JDR’s new deepwater quayside facility at Hartlepool Dock. The first wave energy devices are expected to be deployed in 2011.

“The Wave Hub project draws on JDR’s wealth of experience in the design and manufacture of subsea cable and umbilical systems to produce a solution that will meet the demanding requirements of this innovative application,” stated Patrick Phelan, Managing Director of JDR Cable Systems Ltd, “Our new quayside facility at Hartlepool dock is ideally sized for the manufacture and load-out of this 1500 tonne cable system, and we look forward to supporting the installation process with our team of qualified offshore service technicians”

Tags:

Leave a comment!

Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.

Be nice. Keep it clean. Stay on topic. No spam.

You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

This is a Gravatar-enabled weblog. To get your own globally-recognized-avatar, please register at Gravatar.